Cornelius IAC227 Manual de usuario Pagina 31

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 46
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 30
28630460003
4. Each condenser and flaker is connected with two (2) *pre-
charged lines.
a. The pre-charged lines are ordered separately from the
condenser to suit each individual application.
b. The pre-charged line lengths are 20 feet [6.096 meters],
35 feet [10.66 meters] and 55 feet [16.76 meters].
Note: *(Pre-charged is defined as a vapor holding charge
not a portion of the system charge.)
5. Installation of line kits (see drawing). Remove the tubing
from the carton. Carefully uncoil the lines so the tubing
doesnt become kinked, and route lines to flaker and con-
denser.
6. Keep line-set as short as possible. Place a 3-foot service
loop behind flaker to allow for rear service should it ever be
required.
LIQUID
REFRIGERANT
LINE
DISCHARGE
LINE
CORRECT
Vista de pagina 30
1 2 ... 26 27 28 29 30 31 32 33 34 35 36 ... 45 46

Comentarios a estos manuales

Sin comentarios