INSTALLATION
This section covers unpacking and inspection, selecting location, installing Unit, preparing for operation, and
operation.
UNPACKING AND INSPECTION
NOTE: The Unit was thoroughly inspected before leaving the factory and the carrier has accepted and
signed for it. Any damage or irregularities should be noted at the time of delivery (or not later than 15
days from date of delivery) and immediately reported to the delivering carrier. Request a written inspec-
tion report from Claims Inspector to substantiate any necessary claim. File claim with the delivering
carrier, not with IMI Cornelius Inc.
Unpack Unit as follows:
1. After the Unit has been unpacked, remove shipping tape and other packing material.
2. Carefully inspect the Unit for evidence of damage. If evidence of damage or irregularities is present, file a
claim with the delivering carrier.
3. Unpack LOOSE-SHIPPED parts. Make sure all items are present and in good condition.
Table 2. Loose-Shipped Parts
Item
No. Part No. Name Qty.
1 186573039 Drip Tray 1
2 186642000 Cup Rest 1
3 319941000 Thread Rolling Screw, Hex Washer Hd; No. 832 By 1/2in. Long 4
4 700768 Knob, Beer Valve (Perlick) 2
SELECTING LOCATION
CAUTION: This Unit is intended for indoor installation only. Do not install this Unit in an
outdoor environment which would expose it to the outside elements.
IMPORTANT: Ambient operating temperature for the Unit Must not exceed 100 F. Satisfactory
temperatures may be obtained using blowers, air conditioning, etc. Check local codes.
This Unit may be installed free standing or under a countertop or a bar.
1. Locate the Unit to provide the following minimum clearances:
A. A minimum of 12-inches clearance must be maintained above the Unit to the nearest obstruction .
B. 12inches between back-side of the Unit and the wall.
C. 12-inches on each side of the Unit.
D. The front dide of the Unit must be unobstructed to allow air to enter the Unit.
WARNING: To avoid possible fatal electrical shock or serious injury to the operator, it is
required that a GFCI (ground fault circuit interrupt) be installed in the electrical circuit for
the 115 VAC, 60 Hz Units. It is required that an ELCB (earth leakage circuit breaker) be