Cornelius I Series Manual de servicio Pagina 9

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 28
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 8
6166240010
F. Connect a drain hose to the condensate drain stub tube.
NOTE: All plumbing must be done in accordance with national and local codes.
G. Connect the electrical supply line to the unit.
NOTE: Make sure the proper voltage and number of wires are provided. See serial plate for this in-
formation.
NOTE: All wiring must conform to national and local codes.
H. Turn on water supply and observe the water level in evaporator sections which should be no less than
1/4” below the inclined discharge chute opening of the shell.
I. Turn machine on and check for proper voltage and amp draw on the entire unit as well as components
such as the gearmotor and fan motor.
J. Check refrigerant circuit and all plumbing connections for leaks, etc.
K. Check bin thermostat or mechanical shut–off for proper operations. In the mid–range the bin thermo-
stat will open at 42° and has a 6° differential.
ADJUSTMENT PROCEDURE
WARNING: WATER LEVEL MUST BE MAINTAINED AT THE TOP OF THE EVAPORATOR.
WATER LEVEL
FIGURE 4. WATER LEVEL ADJUSTMENT PROCEDURE
1. Remove gearmotor and auger.
2. Adjust float valve to get water level to top seam of the evaporator.
3. Re–install auger. WATER LEVEL WILL RISE WHEN AUGER IS INSERTED BUT WHEN THE MACHINE
IS TURNED BACK ON AND ICE STARTS BEING MADE, THE WATER LEVEL WILL GO BACK TO THE
ORIGINAL SETTING.
4. Re–install gearmotor assembly and start machine.
Vista de pagina 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 27 28

Comentarios a estos manuales

Sin comentarios