Cornelius UC 150 Manual de usuario Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 14
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
6
620917312
INSTALLATION INSTRUCTIONS
IMPORTANT: It is the responsibility of the installer to ensure that the drains from the dispensing
equipment are installed and maintained according to Federal, State and Local Laws.
1. Locate the dispenser indoors on a level counter top.
A. COUNTER MOUNTING
The ice dispenser must be sealed to the counter. The template drawing indicates the opening that must
be cut in the counter. Locate the desired position for the dispenser, then mark the outline dimensions on
the counter, cut openings in counter.
Apply a continuous bead of NSF International (NSF) listed silastic sealant (Dow 732 or equal) approxi-
mately 1/4 inside of the unit outline dimensions and around all openings. Then, position the unit on the
counter within the outline dimensions. All excess sealant must be wiped away immediately.
2. HOPPER DRAIN ASSEMBLY
A. Clean the hopper interior (see CLEANING INSTRUCTIONS in Operators Manual).
B. Connect the power cord to a 120 volt, 60 cycle, 15-Amp, 3--wire grounded receptacle.
3. The drain tubes are routed through the large opening in the bottom of the unit. The power cord is routed
through the holes in either side of the unit.
A. Use 3/4I nominal plastic pipe.
B. To assure proper drainage, do not allow trap to form in drain line. Be sure drain line runs with a pitch of
1 per foot.
4. SINK DRAIN ASSEMBLY: Connect the drain tube to an open drain. The drain tube must continuously pitch
downward and contain no traps or improper drainage will result.
NOTE: This equipment must be installed with adequate backflow protection to comply with federal, state,
and local codes.
TORSION BAR REMOVAL
The hinged door as shipped from thje factory is set up for the mounting of Corian on the top. In the case where
Corian will not be used, it is recommended that the rear torsion bar be removed so as to decrease the spring
force. To accomplish this task, the rcommended procedure is as follows.
1. Remove balloon Item 46 Ice Deflector by removing the three knurled screws that hold the Ice Deflectory in
place.
2. Break the RTV seal that holds the polymeric inner lid in place. This should be done with a sharp instrument.
3. Gently pry the inner lid out of the stainless steel cover.
4. Now that the complete Torsion Bar Assembly is visible, locate the Counter Balance Pivot which is balloon
item 71. Using an 11/32 socket or equivalent, remove the two 8-32 hex nuts.
5. Carefully pry the pivot up and away from the mounting studs. As you do this, the torsion shafts will move
along with the pivot.
6. Once the pivot is free of the studs, moving it a little further towards you should allow the torsion shafts to
come free of the pivot.
7. You should be able to grab the rear torsion bar at this time and pull away from the end that is captured in the
sheetmetal bracket.
8. Reverst the steps to reassemble the door.
9. RTV liner back in place.
Vista de pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14

Comentarios a estos manuales

Sin comentarios